Builder-grade concrete and what Bonaire owners add to it
Bonaire is growing fast and nearly every new house arrives with the same concrete: a two-car driveway with no room to open a door, a front walk, and a 10 by 10 back pad. Within a year or two of closing, owners in The Cottages at Blue Ridge and Harley Farms South call about three jobs.
- Patio extensions. Taking the builder's pad out to 12 by 16 or 16 by 20 so a table and a grill both fit. We drill and epoxy dowels into the existing slab, match the broom texture, and put a control joint along the seam so the two pours can move without tearing each other. Finishes are on the patios and pool decks page, and stamped or colored work is priced separately.
- Driveway widening and parking pads. An extra 3 or 4 feet down one side, or a pad beside the garage, so the second truck is off the lawn. See extensions and parking pads.
- Shed and generator slabs. A 10 by 12 pad runs $900 to $1,400. Details on the slabs page.
Full replacements of a builder driveway that has dropped or cracked through are priced in the driveway cost guide.
Prices for the jobs Bonaire asks for
| Job | Typical size | Installed price |
|---|---|---|
| Patio extension, broom finish | To 12 by 16 ft | $1,400 to $2,200 |
| Patio extension, stamped | To 12 by 16 ft | $2,500 to $4,300 |
| Driveway widening or parking pad | Per sq ft | $6 to $10 |
| Replace a builder driveway | 800 sq ft | $5,000 to $8,500 plus removal |
| Removal of the old slab | Any | $2 to $4 per sq ft |
| Lift a sunken walk or apron | Per job | $600 to $2,500 |
Bonaire is billed at exactly the Warner Robins rate. The job minimum is $1,200; if a small pad falls under it, we will say so on the phone and suggest pairing it with a walk.
Bonaire clay and freshly graded lots
Bonaire sits on heavy red clay with almost none of the sand you find north toward Byron. In a new subdivision the lot was cut and filled to make a flat building pad, and the driveway and patio often sit on fill that was never compacted the way the house slab was, which is why a three-year-old driveway here can already show a step at the garage.
When we pour in Bonaire we dig out anything soft, bring in crusher run, compact it in two lifts, and proofroll the subgrade with a loaded truck. Builders also leave yards nearly flat, so a patio has to be set with a quarter inch per foot of fall away from the house, and downspouts that discharge onto the slab get piped past it.
Permits for an unincorporated address
Bonaire is unincorporated, so every permit goes through Houston County Building Inspection on Carl Vinson Parkway in Warner Robins, (478) 542-2018. A back-yard patio and a same-footprint driveway replacement do not usually need one. Widening the driveway where it meets the road, or adding a second entrance, needs a county encroachment permit, and we file it as part of the job.
HOA architectural review is common in The Cottages at Blue Ridge and Harley Farms South. We supply the dimensioned drawing, finish description and color sample for your application. Allow two to four weeks for the committee before you pick a pour date.
Pouring with a PCS date in mind
Robins Air Force Base is the county's largest employer. Many homeowners are on a three-year assignment, so we quote with resale in mind and write warranties that transfer to the next owner. A neutral broom-finish patio and a widened driveway show up in listing photos and appraisals; a heavily patterned stamped patio in a bold color may not return what it cost, and if you are leaving in 18 months we will say so when you ask which finish to pick.
A patio extension pours in one day and a driveway replacement takes three including tear-out. The warranty paperwork names the property rather than you, so it goes to the next owner with the house.
Questions we get asked
Will a patio extension match the builder's slab?
Close, not identical. The new pour will be lighter for a year or so before it blends. We match the broom direction and edge profile, and the joint at the seam reads as a design line rather than a patch.
My builder driveway cracked after two years. Is that a warranty issue?
Read your builder warranty first; many treat surface cracking as cosmetic. We will measure the slab thickness at an exposed edge and give you a written opinion on whether it is shrinkage or a base failure.
Do I need HOA approval for a patio in Bonaire?
In the newer subdivisions, usually yes for anything visible from the street or a neighbor's lot. We prepare the drawing and sample for the committee; the county permit, where one is needed, is separate.
Is there a travel charge to Bonaire?
No. Bonaire is inside Houston County and ten to fifteen minutes from our base. Prices are the same as Warner Robins.
How long does a patio extension take?
One day on site for a broom finish, two for stamped.
Get a written quote
Tell us what you need and where. Sandhill Concrete matches your project with a licensed Houston County concrete contractor, who measures on site, writes the quote and does the work. You hear back within one business day by text or email with a site-visit window, and the written quote states thickness, reinforcement, base and removal so you can compare it line by line.
Concrete services
Nearby areas
We also pour in Warner Robins, Kathleen, Perry.